TranceAddict Forums (www.tranceaddict.com/forums)
- USA - New York
-- This is what you get for $2 and 'mta strikes'
Pages (3): « 1 [2] 3 »
| quote: |
| Originally posted by get nyce better than standing on a crowd with the potential of not having AC lol this way im sweating while staying active versus standing and sweating so everyone can see it roll down my face like i'm in a sauna.. i was embarrassed to be sweating...thats how much i was sweating lol |
| quote: |
| Originally posted by get nyce better than standing on a crowd with the potential of not having AC lol this way im sweating while staying active versus standing and sweating so everyone can see it roll down my face like i'm in a sauna.. i was embarrassed to be sweating...thats how much i was sweating lol |
Re: This is what you get for $2 and 'mta strikes'
| quote: |
| Originally posted by get nyce FUCKING NO AIR CONDITION ON AN EXPRESS TRAIN THAT HAS 2 LOCAL TRAINS GOING FASTER THEN IT YES IM MAD AND YES I FEEL LIKE SAYING SOMETHING FUCKING MTA |
| quote: |
| Originally posted by get nyce you should be fine, its just my bad luck thats all... |
| quote: |
| Originally posted by yankeeBaby not just yours, I work in the bronx now and I took a B train with no AC yesterday. NO luxury of getting a new shirt in the BX tho, unless you go to one of those ghetto ass stores. pfft. thats not professional. lol the only dressup clothes they have where I work are those pimp-lookin neon suits with the alligator skin shoes to match |
| quote: |
| Originally posted by jerZ07002 that sux....i get on the 4 train at fulton in the AM, and the trains are soooooo packed that i have to watch four or five trains go by b4 i can even get on a train. All the time standing on the platform while it's 110 degrees. That's pretty bad too. Watching the local trains speed by is far worse than no A/C. |
Re: Re: This is what you get for $2 and 'mta strikes'
| quote: |
| Originally posted by Blake were you on the 4,5,6 line by chance? locals always seem to run faster than the express at a certain point on those trains. isn't there supposed to be another fare hike within the next couple of years? |
| quote: |
| Originally posted by phuzzyfish12 Just had a whole article on how over-crowded the 4/5 trains are. It is sick I HATE getting on them during rush hour!!! |
| quote: |
| Originally posted by yankeeBaby lol the only dressup clothes they have where I work are those pimp-lookin neon suits with the alligator skin shoes to match |
| quote: |
| Originally posted by Trancealot I took the E train this morning. It goes slow for quite some time and makes it to queens plaza or roosevelt. Then it goes crazy fast Yestarday was not too bad except I had no room to hold on to a railing heading home I was also watching the news fox 5 last night about the MTA. Do people actual jump into a crowd of people when it gets too packed? This guy said it like he was having fun doing this. |
Scattered power outages in NYC
Bronx into UES affected
Eyewitness News
(New York - WABC) - Eyewitness News has learned of scattered power outages in the South Bronx into Manhattans east side.
The Transit Authority says service is affected on the 4, 5 and 6 lines and E & Z on the east side and the D train in the Bronx.
Trains are moving, and running on DC power, but the signals are what's affected because they run on AC which is supplied by Con Ed.
The source of the problem is not known.
Residents said traffic lights were out for 20 blocks on Lexington Avenue between the 60s and the 80s, while others said that the East Side subway lines weren't operating.
Con Edison couldn't say how many customers had lost power. The city was in the second day of temperatures well over 90 degrees.
The Transit Authority says its problems started after 3:30 p.m.
The NYPD tells us they are getting outage reports in the 19th pct and the 23rd on the Upper East Side, and 44 pct in the Bronx.
Stay with Eyewitness News and 7online.com for team coverage on today's weather and power outages.
thought you would like that Brian
i dont know whether thats a good thing or a bad thing lol...
Re: Re: Re: This is what you get for $2 and 'mta strikes'
| quote: |
| Originally posted by phoenixBEBE I think by 2010 its sposed to become $2.40...with the monthly unlimited going up to $99 or something around that range. Hrms do u THINK that the 2nd avenue subway line will be completed even by then??? Just saying...that is/was one of many projects that the hikes/taxes are sposed to go to now in order to facilitate completion |
Try the london underground in the summer.
No A/C on any trains. Not faulty or malfunctioning....there just is none.
Gets somewhat toasty...
| quote: |
| Originally posted by yankeeBaby I am sure that the Eastsiders are super-excited, then, to have the construction of the 2nd Ave line back up and running (supposedly anyways). I saw this poster in the subway, saying that they were building the 2nd ave line in intervals: like downtown to 4th to be entirely completed FIRST, then 4th to 96th, then 96th to 125th. (orwhatever the numbers were). That way at least they can get part of it running while they work on the rest. That should take some pressure of the east side lines. |

| quote: |
| Originally posted by jerZ07002 the 2nd ave subway is supposed to be done by sometime around 2020. i'm sure you'll be in suburb somewhere by that time. |
Re: Re: Re: Re: This is what you get for $2 and 'mta strikes'
| quote: |
| Originally posted by jerZ07002 the 2nd ave subway is supposed to be done by sometime around 2020. i'm sure you'll be in suburb somewhere by that time. |
Expected construction dates:
-2007-2014[19]: Phase 1 (96th St. to 63rd St.) State Funding In-Place, Federal Funding Approved.[20] A $333 million contract was awarded on March 22, 2007 to three American firms to build Phase One. Construction work began on 2nd Avenue between 91st and 96th Streets on April 23, 2007 (though the ceremonial groundbreaking was held on April 12, 2007).
-2014-2017: Phase 2 (125th St. to 96th St.) Engineering ongoing. No funding commitments.
-2015-2018: Phase 3 (63rd St. to Houston St.) Engineering ongoing. No funding commitments.
-2017-2020: Phase 4 (Houston St. to Hanover Sqr.) Engineering ongoing. No funding commitments.
Pasted from Wikipedia, but is basically what MTA has said http://www.mta.info/capconstr/sas/index.html
| quote: |
| Originally posted by Freak Expected construction dates: -2007-2014[19]: Phase 1 (96th St. to 63rd St.) State Funding In-Place, Federal Funding Approved.[20] A $333 million contract was awarded on March 22, 2007 to three American firms to build Phase One. Construction work began on 2nd Avenue between 91st and 96th Streets on April 23, 2007 (though the ceremonial groundbreaking was held on April 12, 2007). -2014-2017: Phase 2 (125th St. to 96th St.) Engineering ongoing. No funding commitments. -2015-2018: Phase 3 (63rd St. to Houston St.) Engineering ongoing. No funding commitments. -2017-2020: Phase 4 (Houston St. to Hanover Sqr.) Engineering ongoing. No funding commitments. Pasted from Wikipedia, but is basically what MTA has said http://www.mta.info/capconstr/sas/index.html |
I hate relying on the MTA for my commute to work. The fucking LIRR blows ass. Whenever something is wrong you don't see a conductor or ticket collector until AFTER the problem is resolved, they're always in hiding. Sometimes they don't even let you know what the problem is over the PA.
As for the subways, they also suck. For $2 a ride, we should be entitled to MUCH better service. There was this fat lady (who worked for the MTA to direct traffic I guess) on the platform at the 51st St station for the 6 train, all she was doing was getting in the way. I was honestly tempted to fucking hip check her. Oh well, any changes they make won't go into effect for another few months/years. Bastards.
| quote: |
| Originally posted by danlaxx1 I hate relying on the MTA for my commute to work. The fucking LIRR blows ass. Whenever something is wrong you don't see a conductor or ticket collector until AFTER the problem is resolved, they're always in hiding. Sometimes they don't even let you know what the problem is over the PA. As for the subways, they also suck. For $2 a ride, we should be entitled to MUCH better service. There was this fat lady (who worked for the MTA to direct traffic I guess) on the platform at the 51st St station for the 6 train, all she was doing was getting in the way. I was honestly tempted to fucking hip check her. Oh well, any changes they make won't go into effect for another few months/years. Bastards. |
yea train delays and no ac suck
and now alot of days when theres a train delay its cause of "police activity" at a train station so they shut it down or make the trains go reallly slow
but when subway lines are down for the like the weekend or a few days and they re-route trains its usually cause of track work
by time they finish the line they started in a few days they gotta start over again cause the rail and concrete they run on is weak
| quote: |
| Originally posted by jerZ07002 you really think you deserve more service for $2? If you bought a pack of gum that was about $2 dollars you wouldn't be complaining that the newstand guy owes you better service. We're lucky to have such a good public transportation system. Honestly, i think the subway provides excellent service for the money. where else can you travel up to twenty miles (and even more) for two dollars? How much would a taxi cost from the upper west side to JFK? 40 - 50 dollars? If you walked even two miles it would cost more with all the stops to buy food or water. |
| quote: |
| Originally posted by Freak Expected construction dates: -2007-2014[19]: Phase 1 (96th St. to 63rd St.) State Funding In-Place, Federal Funding Approved.[20] A $333 million contract was awarded on March 22, 2007 to three American firms to build Phase One. Construction work began on 2nd Avenue between 91st and 96th Streets on April 23, 2007 (though the ceremonial groundbreaking was held on April 12, 2007). -2014-2017: Phase 2 (125th St. to 96th St.) Engineering ongoing. No funding commitments. -2015-2018: Phase 3 (63rd St. to Houston St.) Engineering ongoing. No funding commitments. -2017-2020: Phase 4 (Houston St. to Hanover Sqr.) Engineering ongoing. No funding commitments. Pasted from Wikipedia, but is basically what MTA has said http://www.mta.info/capconstr/sas/index.html |
| quote: |
| Originally posted by danlaxx1 I hate relying on the MTA for my commute to work. |
| quote: |
| Originally posted by yankeeBaby lol thanks, I was totally making up those numbers just to give people an idea of the poster I saw |
i actualy havent read the ACTUAL numbers yet i should go and look at Jerz's post more carefully!!
)
Powered by: vBulletin
Copyright © 2000-2021, Jelsoft Enterprises Ltd.