| quote: | Originally posted by TO guy
Yeah, the Sheppard line turned out to be quite a mess too.
Any recent word on the York U line? |
| quote: | Proposed Alignment
The environmental assessment and public consultation process finalized the proposed alignment of the York University extension. Initially, there was some debate over whether the line should cross CN’s Newmarket subdivision (which the Bradford line GO Trains use)closer to Finch or Sheppard Avenues, and whether the line at Steeles should face northeast for a possible extension towards Yonge Street, or northwest for a possible extension towards Jane and Highway 7.
Work would begin at Downsview station. A new pocket track would be built where the line emerges from tunnel south of Downsview station. Initially this pocket track was to be built north of Downsview station, but such a construction would have required a number of businesses to be expropriated and demolished. The pocket track would allow the TTC to short turn trains — originally at Downsview, but with the change, now at Wilson — raising the possibility that the rush hour practise of short turning certain trains at St. Clair West station could be resurrected at Wilson.
North of Downsview, the line would curve gently west, passing beneath Sheppard Avenue at Chesswood Drive and proceeding west a short distance south of Sheppard Avenue. A station stop, tentatively named Sheppard West, would be built immediately west of the GO Bradford line. There would be pedestrian entrances leading to Sheppard Avenue and possibly towards Downsview Park, and an on-street transfer with Sheppard Avenue buses. A connection with the Bradford GO line could also be provided.
The TTC briefly considered naming this station Park or Parc Downsview Park, but decided to retain the name Sheppard West to avoid confusion with Downsview station next door.
Continuing west, the line would pass beneath Sheppard Avenue at Ceramic Road, and then curve gently north, passing beneath Keele Street at St. Regis Crescent, and continuing north under Keele Street. Finch West station would be built beneath the Keele/Finch intersection, featuring a bus terminal connecting with Keele and Finch West buses, commuter parking in the Hydro right-of-way and a passenger pick-up/drop-off area.
Currently, this station is tentatively named Finch West. In a report, the TTC dismissed a suggestion of naming the station Keele North, but the commission hasn’t considered other suggestions, including Keele/Finch. This station’s name, along with all the others on the extension, shouldn’t be considered permanent until they are engraved on the station walls.
North of Finch West station, the line continues north beneath Keele Street before turning gradually northwest. The next station, tentatively named York University, would be located beneath York University Commons, where a number of transit vehicles currently meet. The station would connect to nearby buildings, but would have no off-street bus terminal. Connections with the TTC, GO, York Region and VIVA would occur on-street.
Continuing northwest, the line would enter the Steeles West complex, with a station beneath Steeles Avenue a few hundred metres east of Murray Ross Parkway. There would be pedestrian entrances, and separate TTC, York Region/VIVA and GO Transit bus terminals, with a passenger pick-up/drop-off alongside a large commuter parking lot in the Hydro right-of-way running north of Steeles Avenue. The line would continue some distance northwest into York Region, to allow for the placement of pocket tracks.
An extension east along Steeles Avenue has been precluded. Further extensions will be to the northwest into Vaughan. If the Belt Line proposal is resurrected, trains will have to run along Highway 7, which seems unlikely. Despite this, the TTC believes that the extension will help reduce congestion on the Yonge subway, by diverting as many as 2000 rush-hour commuters by intercepting passengers on Finch and Steeles before they travel all the way to the Yonge line.
The extension would be 6.2 kilometres long. If approved tomorrow, it would take between five and seven years to design and build.
|
| quote: | As of January 2006, the York University extension remains the TTC’s top priority for subway expansion, despite the likely construction of a bus-only road between Downsview station and York University later in the year. Before the resignation of Greg Sorbara as Finance Minister while a conflict of interest investigation takes place, there was some hope that provincial funding would be announced for the extension in the 2006 budget. That now seems uncertain. Also, while the environmental assessment process drew to a close, the media played up the realization that the Scarborough RT was nearing the end of its design life and would need to be renovated or replaced, possibly by an extension of the Bloor-Danforth subway.
|
you can read the whole thing in full on Transit Toronto
___________________
Deviant Art - Smuncky
My Photos on Flickr
If anyone wants to share their clubbing/nightlife pics go to Toronto Nightlife
"The best car-related innovation we have is not to improve the car, but eliminate the need to drive it everywhere we go.” -Alex Steffen
|