|
| quote: | Originally posted by Schwab
5/8" Plywood, Screws, Skill Saw, Screwdriver. Done. |
+1. I built my entire DJ/studio setup with that list, plus one 16 foot x 1.1/8" dowell, some plumbing pipe fixtures, and some shelf brackets. Whole thing cost me less than $80 and took half a day to make.
|